reçu par mail / lundi 6 septembre 2021
In Bure (France), the State wants to build a center for burrying nuclear waste. In September 2021, the public hearing to determine the public utility (DUP) of the CIGÉO project will begin. A pseudo-participatory show that will open the way for the next works and expropriations. Our « public participation » means resistance and sabotage – exiting nuclear power requires manual work.
Link of the video: https://kolektiva.media/w/5vPsTQprBArxx7C9WwxTBN
[en français]